Instructions  This assignment has to be solved using ETAP  Guide to use ETAP .

I’m studying for my Engineering class and don’t understand how to answer this. Can you help me study?

Design Procedure

 Draw the oneline shown on the next page using ETAP  The length of all the cables is 500 ft. Chose a cable sized 750 kcmil at 15 kV rated voltage. Use the ETAP library feature to select the cables.  Short circuit rating of the source is 100 MVA and the source impedance is 0.42 Ω.  Analyze the oneline using load ow analysis.  Observe and correct (a) the bus undervoltages (b) cable overloads.  The bus undervoltage should be no lower than 97% of the nominal voltage. Assignment Submission

 Submit a printout of the final successful oneline diagram showing the power flows and bus voltage percentages generated by ETAP  Submit the final complete load ow report generated by ETAP.  The next part of the assignment consists of studying the impact of PV penetration on the bus voltages.

Quite Quote

QUICK QUOTE

Approximately 250 words

custom essy

Order an essay from experts and get an A+

Address: 679 Dola Mine Road Raleigh
Email: support@academic-research-pro.com
Website: www.academic-research-pro.com
Toll Free: +1800-672-9816

Disclaimer

All Papers produced are meant for reference purposes only. Academic Research Pro does not give the consent and authority to copy and reproduce the papers.

Terms and Conditions | Privacy Policy 

Banner of payment methods of cheap essay writing service